Where we work and we worked

ITALY

Menaggio Bypass Tunnel

Owner/Client:

Todini Costruzioni Generali S.p.A.

Cost of works:

€ 26 million

Period of Activity:

2004 - 2006

Menaggio Alternative Road runs underneath the town of Menaggio (about 200m above sea level) for a total length of 2km, including the 1.8km-long Menaggio Tunnel on the Como Lake shore.

— Project Description:

The work was included in the Menaggio bypass project, consisting of the new SS 340 “Regina” alignment between Nobiallo and Pastura. The Project was planned to ease the intensity of traffic flow caused by the inefficiency of the roads that run across the town. Together with Menaggio tunnel, the construction of the junction works and access to the existing main roads consisting of jump connections (Southern entrance) and viaducts with corresponding acceleration and deceleration ramps (Northern entrance) were also designed. Menaggio tunnel has a two-lanes layout (90m 2 cross-section) with 10 three-lane sections at intervals (130m 2 cross section) for emergency and de-acceleration purposes.

— Description of Services:

Detailed Design and Construction follow-up.

GEODATA, a provider of sustainable and value-added solutions for underground projects to meet the ever-increasing demands of transportation and sustainable development.

Certifications

GEODATA is certified

  • ISO 9001:2015
  • ISO 14001:2015
  • ISO 45001:2018

GEODATA S.p.A.

  • Corso Bolzano 14
    10121 Turin - Italy
  • +39 011.58.10.611
  • +39 011.59.74.40
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

© 2022 GEODATA SpA - P.IVA 10132770016 | GEODATA Engineering SpA - P.IVA 04639280017 - All rights reserved
Privacy Policy | Cookie Policy | Company details | GEODATA Webmail | Credits