Chontal Hydroelectric Project

Owner/Client:

HydroEquinoccio SA (Gobierno Nacional de la República de Ecuador)

Cost of works:

USD $ 390 million

Period of Activity:

2009 - 2012

The Chontal hydroelectric plant, with an installed capacity of 194MW, is located in the middle basin of the Guayllabamba River, in the Provinces of Pichincha and Imbabura. The Project is part of a wider program of the Government of Ecuador for the hydroelectric development in the Guayllabamba basin, which foresees the future construction of 8 similar projects.

— Project Description:

The Chontal power plant has a reservoir capacity of 22Mm 3 created by a 142m-high concrete gravity dam (RCC). The main features of the project are: power intakes for a discharge capability of 180m 3 /s, a 900m- long headrace tunnel with an internal diameter of 7m, a 55m-high surge shaft with a diameter of 14m, a 220 m-long horseshoe penstock, an open air power plant for 2 Francis turbines, and a 115m-long tailrace channel. The Power Plant will have an annual production of about 1000GWh.

— Description of Services:

Feasibility Study and Detailed Design of civil works and E&M equipment, including Environmental Impact Assessment (EIA).

GEODATA, a provider of sustainable and value-added solutions for underground projects to meet the ever-increasing demands of transportation and sustainable development.

Certifications

GEODATA is certified

  • ISO 9001:2015
  • ISO 14001:2015
  • ISO 45001:2018

GEODATA S.p.A.

  • Corso Bolzano 14
    10121 Turin - Italy
  • +39 011.58.10.611
  • +39 011.59.74.40
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

© 2022 GEODATA SpA - P.IVA 10132770016 | GEODATA Engineering SpA - P.IVA 04639280017 - All rights reserved
Privacy Policy | Cookie Policy | Company details | GEODATA Webmail | Credits