Geodata S.p.A. | home
WE TURN IDEAS INTO PROJECTS ... EVERYWHERE
Turning ideas into projects and guiding them to completion has been our dedicated task for the past 26 years. Experimentation, innovation and state-of-the-art competences enable GEODATA to manage both the general and specific (and sometimes complex) aspects of  the projects. To deliver services of the highest quality is one of our fundamental objectives; this helped GEODATA to become a recognised reference in the field as demonstrated by the success of our book "Mechanized Tunnelling in Urban Areas", published by Taylor & Francis (2007).

germoglio_en
We work with passion all-over the world; we are present (with our offices) in 15 countries and have worked on projects in 45 countries.

Sedi Geodata nel mondo

GEODATA is an international engineering company, recognized as a leader in the design of underground works. Our consolidated capabilities and experience in geotechnical, environmental, structural and hydraulic engineering have been recently integrated with capabilities in the fields of architecture, urban transformation, road and railway design, technological plants, E&M engineering, and project management.
 
 

NEWS

Achievement of the Environmental Management Systems Certificate (UNI EN ISO 14001) (April 2010)

Geodata has always been aware of the importance of the environmental protection, and now has implemented a care policy operative strategy for the environment in all its procedures and projects. We made our managing tools compatible with sustainable development and optimize our activities. The environmental protection has become top priority for the Company Management. For this reason, procedures for the UNI EN ISO 14001 certification started with the intent to insure the improvement of the Environmental System and its performances

Read more text
 
Change of Corporate name (May 2010)
To assume a structure more suited to the many businesses of the group, the Geodata Group has been organized into a holding company that brings together all the affiliated companies in Italy and around the world. The new holding company acquires both the brand and the name of the group leader which has changed the name to "Geodata Engineering S.p.A.".
Read more text
 
Balance Sheet Approval (April 2010)

On the 14th of April, Ordinary Shareholders' Meeting approved the Company Balance Sheet dated 31/12/2009.

 


 
Buenos Aires (March 2010)

Mr. Grasso, president of Geodata, was one of the invited lecturers to the "Seminario de Túneles y aplicaciones ITS" (held in Buenos Aires from the 23rd to the 26th of March) and delivered a presentation on the subject of "Construction of road and railway tunnels in mountain areas". In addition, the stand of Geodata received the award of "The Best Stand" from the exhibition organiser of the Seminar.

 


 
Torino-Ceres (February 2010)
Geodata, in joint-venture with some other companies, was awarded the final design of underground railway link Torino-Ceres,  relevant work to the completion of  Turin crossrail link

 
Coca Codo Sinclair (December 2009)

Geodata has formalized the contract for the design and construction follow-up of the hydroelectric power plant Coca Codo Sinclair. It is one of the largest hydroelectric power plants in South America (1500MW) and will supply Ecuador with the 62% of the total power needed.



 
Buenos Aires, Maldonado (December 2009)

The second TBM, which had been previously pre-assembled at ground level, was lowered to the bottom of the 30m deep shaft at Punta Carrasco, from which the excavation of the second 10 km long flood-control tunnel shall begin

 


 
Eucentre (November 2009)

Starting from November 2009 Geodata jointed the "Gold Sponsor Companies" of EUCENTRE of Pavia, Italy, with the aims to begin an effective collaboration with the centre and to implement a more efficient seismic verification procedure for underground structures in the current engineering practice of Geodata.



 
Post-graduate Master Course in "TUNNELLING AND TUNNEL BORING MACHINES" 2009-2010 (November 2009)

The Opening Ceremony of the course took place on the 16th of November 2009 in Politecnico di Torino. In addition to provinding financial support, Geodata provided 10 professional engineers to deliver lectures.

 


 
Chinese edition of "Mechanized Tunnelling in Urban Areas" (November 2009)

The well-established experience in Mechanized Tunnelling in Urban Area allowed Geodata to publish a book on this subject in 2007 (Taylor & Francis). Now the book is also available in Chinese

 


 
Malaysia (October 2009)

A new electrified double-track railway in the north-west part of Malaysia (up to Thailand border) is under construction. Geodata has been awarded the contract to develop the design of the tunnels including the longest rail tunnel in south-east Asia (Berapit tunnel) and to supervise the construction works. Currently, the tunnel and lining works have already been completed for Larut tunnel (a few months in advance of the schedule).

 


 
Turin Metro (September 2009)
The TBM named Catherine broke through the last diaphragm wall on 23 September 2009, completing the excavation of Line 1 extension from Porta Nuova to Lingotto. The tunnel extension was designed and supervised by Geodata.



 
Bochum symposium (September 2009)

Geodata attended the symposium EURO:TUN 2009 at the Ruhr University in Bochum (Germany) and presented three papers about interesting cases-histories using advanced numerical modeling.

 

 


 
ITA-CET Foundation (September 2009)

 

The ITA-CET Foundation (Foundation on Education and Training for Tunnelling and Underground Space Use) was officially created in Lausanne at EPFL on Friday, the 25th of September 2009. Geodata is among the Founders of the Fundation and Piergiorgio Grasso has been nominated as its Vice President

 


 
8 May 2009: save the date

On May 8th 2009, GEODATA turned 25! The event was celebrated with "One day at Court" at the Palace of Venaria Reale (Torino)


 
Hydroelectric power plants in Ecuador (March 2009)

GEODATA signed two contracts for designing four hydroelectric power plants for a total of 850 MW in Ecuador


 
Welcome to the new GEODATA website (April 2009)
The new version of our website is online, with new graphic design and enhanced contents. Enjoy the browsing!


 
New job in Brazil (February 2009)

Once again GEODATA takes up a challenge with an important high speed railway project: we have been awarded a contract for theRio de Janeiro-Saõ Paulo line


 
Verona ring road Project Financing tender (October 2008)

In 2008, GEODATA participated in the Project Financing tender for the construction of the North Ring Road section in Verona. The proposed solution was developed on the basis of environmental and transport analyses ti realize an 8km-long tunnel under-crossing the Adige River. Drawing from the experience of some of the most recent international projects (Paris A86, Kuala Lumpur Smart Tunnel), the TBM-excavated tunnel is structured on two levels, one for each direction, with the pedestrian-safety passages at every 500m; the tunnel will only be open to light vehicle traffic.


 
Go ahead for the final design of line 1 of Bologna metro-tramway (September 2008)

GEODATA is the leader of the joint venture developing the final design for line 1 of the Bologna metro-tramway that was approved by the Conferenza dei Servizi of the Ministry for Infrastructures. This project presented an exciting technical challenge: build a modern, technically advanced infrastructure respecting and enhancing a delicate historical urban context with the largest possible support. This was achieved by re-thinking the relationship between surface and underground. These spaces, reconsidered also through a novel technical approach, will enable creating new significant places for mobility and social life in the evolving city.

Read more text

SEARCH

< © Copyright 2010 GEODATA Engineering S.p.A. - P.Iva 04639280017 | Tutti i diritti sono riservati - Termini d'uso >
Credits