Hydroelectric Plant Moraca
MONTENEGRO

Hydroelectric Plant Moraca

Owner/Client:

Enel

Cost of works:

€ 257 million

Period of Activity:

2010 - 2011

The Moraca Hydroelectric Project is located upstream of the river Moraca Podgoriza. The project expands along the Moraca River for about 30km-long and will develop a 4 cascade system, totally independent of each other, which are expected to produce enough energy to meet the half of the current household consumption in the country.

— Project Description:

The Andrijevo hydroelectric plant will have a impounding reservoir of 304Mm 3 created by a 150m high arch dam, a power intake designed for a discharge of 111m 3 /s, a headrace tunnel 194m-long with variable diameter from 8 to 6.8m ending in 3 manifolds 3.6m diameter, an open air power plant with installed 2 Francis turbines and a 3 rd turbine for the environmental release. The main data of the Power Plant are 111mc/s discharge; 135m gross head; an installed power of 130 MW and an annual production of 318 GWh.

— Description of Services:

  • Pre-Feasibility design (Andrejevo, Zlatica, Raslovici,Milunovici)
  • Feasibility design (Andrejevo)

GEODATA, a provider of sustainable and value-added solutions for underground projects to meet the ever-increasing demands of transportation and sustainable development.

Certifications

GEODATA is certified

  • ISO 9001:2015
  • ISO 14001:2015
  • ISO 45001:2018

GEODATA S.p.A.

  • Corso Bolzano 14
    10121 Turin - Italy
  • +39 011.58.10.611
  • +39 011.59.74.40
  • This email address is being protected from spambots. You need JavaScript enabled to view it.

© 2022 GEODATA SpA - P.IVA 10132770016 | GEODATA Engineering SpA - P.IVA 04639280017 - All rights reserved
Privacy Policy | Cookie Policy | Company details | GEODATA Webmail | Credits