Instituto Costarricense de Acueductos y Alcantarillados /CSM Bessa
USD 19 million (sewage Tunnel)
2013 - 2015
The most important structure is a 1.8 km sewage tunnel with an internal diameter of 2,800 mm, to be excavated under populated areas and the main city ring, conveying the total flow to the Wastewater Treatment Plant. There are hydraulic structures at the two portals in order to connect the tunnel to the surface network of waste water; moreover a chamber for permanent access to the tunnel is foreseen. An EPB-Shield type of TBM (CSM BESSAC, Ø=3.10) was foreseen to excavate the tunnel and a universal type of ring (19.0cm thickness) is to form the main lining of the tunnel.
• Critical review of the geological context and the available geotechnical parameters; • Temporary and permanent works for the hydraulic structures on the two rivers (Rio Aguilar and Rio Torres); • Forecast of the settlements induced by the tunnel excavation; • Building Risk Assessment related to the settlement forecast; • Plan of advance of TBM (PAT) with definition of the face pressure to be applied in order to minimize the settlements; • Tunnel Design (geometry and reinforcement) and Portals Design (geometry and reinforcement).
© 2022 GEODATA SpA - P.IVA 10132770016 | GEODATA Engineering SpA - P.IVA 04639280017 - All rights reserved
Privacy Policy | Cookie Policy | Company details | GEODATA Webmail | Credits
Progettazione e realizzazione sito web
vg59* Progetti Multimediali
Corso Bolzano 14 - 10121 Torino
P.I. 10132770016
REA TO-1108130
Capitale sociale i.v. 6.612.840€
PEC: Questo indirizzo email è protetto dagli spambots. È necessario abilitare JavaScript per vederlo.
Corso Bolzano 14 - 10121 Torino
P.I. 04639280017
REA TO-648000
Capitale sociale i.v. 3.469.700€
PEC: Questo indirizzo email è protetto dagli spambots. È necessario abilitare JavaScript per vederlo.
Per la fatturazione elettronica: Questo indirizzo email è protetto dagli spambots. È necessario abilitare JavaScript per vederlo.