Turin Automatic Metro - Line 1 - Italy

Home » Metro »

The construction of Line 1 of the Turin metro completes the realisation of a modern collective transport system, which included various projects developed to grant a new transport network to the city.

In this context, the realisation of the new Line 1 is crucial. The choise of a VAL System as reference technology – the first in Italy – gives a high added value in terms of functional and transportation reliability, economy and safety of the work.

In addition to problems associated with the urban context, the project of the line had to deal, with success, with the unalterable programmatic constraints linked to the completion of the work on time for the Winter Olympic Games of 2006 (first section) and the Celebration of 150th Anniversary of the Unification of Italy of 2011 (second section) 

Additional Info

  • Owner: GTT – Gruppo Torinese Trasporti S.p.A. then INFRA.TO S.p.A.
  • Period of activity: 1996-2011
  • Description of the works: Line 1 runs entirely underground, with a single twin track running tunnel with diameter of 6.80 m. The first section, in operation since February 2006, links Collegno to Porta Nuova, with a total length of 9,6 km excavated using 3 Tunnel Boring Machines (TBM). 15 stations were realized using cut&cover method. The second stretch, in operation since February 2011, develops southwards under Via Nizza, from Porta Nuova railway station to Lingotto, with a total length of 3,7 km and 6 underground stations In 2008 the final design for the extension of the line to Piazza Bengasi and Moncalieri has been approved, for further 1,9 km of running tunnels and 2 more stations.
  • Geodata activity: Final and detailed design and works supervision of alignment, civil works, and electro-mechanical installations Health & Safety Coordination during construction of all lots for civil works for stations, shafts, running tunnels, of lot for E&M installations and rail system. Works supervision included monitoring in real time of excavation with a GDMS system