|
Coca Codo Sinclair (December 2009) |
|
|
Geodata has formalized the contract for the design and construction follow-up of the hydroelectric power plant Coca Codo Sinclair. It is one of the largest hydroelectric power plants in South America (1500MW) and will supply Ecuador with the 62% of the total power needed.
|