Geodata S.p.A. | home
Buenos Aires, Maldonado (December 2009) Print

The second TBM, which had been previously pre-assembled at ground level, was lowered to the bottom of the 30m deep shaft at Punta Carrasco, from which the excavation of the second 10 km long flood-control tunnel shall begin

 

 
< © Copyright 2010 GEODATA Engineering S.p.A. - P.Iva 04639280017 | Tutti i diritti sono riservati - Termini d'uso >
Credits