|
Buenos Aires, Maldonado (December 2009) |
|
|
The second TBM, which had been previously pre-assembled at ground level, was lowered to the bottom of the 30m deep shaft at Punta Carrasco, from which the excavation of the second 10 km long flood-control tunnel shall begin
|