|
Verona ring road Project Financing tender (October 2008) |
|
In 2008, GEODATA participated in the Project Financing tender for the construction of the North Ring Road section in Verona. The proposed solution was developed on the basis of environmental and transport analyses ti realize an 8km-long tunnel under-crossing the Adige River. Drawing from the experience of some of the most recent international projects (Paris A86, Kuala Lumpur Smart Tunnel), the TBM-excavated tunnel is structured on two levels, one for each direction, with the pedestrian-safety passages at every 500m; the tunnel will only be open to light vehicle traffic.
|